
Residential · 2024
Ridgeline Residences
Twelve custom hillside residences with shared infrastructure on a steep, geologically sensitive site.
All projects
- Client
- Ridgeline Partners
- Location
- Boulder, CO
- Size
- 58,000 sq ft
- Duration
- 20 months
- Delivery
- Design-build
Scope of work
- Slope stabilization
- Caisson foundations
- Custom framing
- High-performance envelope
- Private drives and utilities
The challenge
A 28% average grade and a soils report calling for deep caissons on every lot made access and sequencing the whole job.
Our approach
We built the shared access road and utility corridor first, then worked top-down so no finished lot was ever driven over, staging caisson rigs on temporary benches cut into the slope.
The outcome
All twelve homes delivered without a slope failure or a single erosion-control violation across two spring runoff seasons.
Gallery
On site



Building something like this?
Tell us about your site, your program and your deadline. We will put a real number and a real schedule in front of you.


