Industrial · 2024
Cheyenne Distribution Center
A 640,000 square foot tilt-up distribution facility with 40-foot clear height and full automation infrastructure.
- Client
- Continental Logistics
- Location
- Cheyenne, WY
- Size
- 640,000 sq ft
- Duration
- 14 months
- Delivery
- Design-build
Scope of work
- Mass grading
- Tilt-up panels
- Super-flat slab
- Dock equipment
- Conveyor infrastructure
The challenge
The owner needed the building racked and operating before peak season, which left fourteen months from ground-breaking to first pallet on a site with expansive soils and a short pour window each winter.
Our approach
We over-excavated and moisture-conditioned the pad before frost, cast panels on the slab in two staged lifts, and used heated enclosures to keep the super-flat floor pours going through January.
The outcome
Certificate of occupancy issued 11 days early. Floor flatness measured F50 across the racked area, well above the specified tolerance.